Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Zurn Retrofit

Installation
  • All plumbing is to be installed according to state and local codes and regulations.
  • Turn off water supply before beginning installation.
  • Check battery compartment for proper polarity.
  • Connect vacuum breaker to control stop outlet.
  • Calibrate sensor range using included hex key.
  • Test automatic flush cycle after installation.
Maintenance
  • Replace batteries according to usage frequency (typically every 3-4 years).
  • Clean sensor window periodically with non-abrasive cleaner.
  • Inspect diaphragm and seals annually for wear or damage.
  • Check for leaks at connections during routine facility maintenance.
  • Verify sensor calibration remains optimal for the space.
  • Reset unit if erratic operation occurs by removing and reinstalling batteries.
Go to Table of Content