Installation
- Mount the Elkay EDF15R fountain on a smooth, flat, finished wall surface with adequate support structure.
- Establish the rim height at which the fountain is to be mounted, following ADA or local requirements if applicable.
- Refer to the rough‑in diagram for plumbing layout and dimensions.
- Locate and install the trap (not included) beneath the fountain.
- Install a shut‑off valve (not included) on the building water supply line.
- Secure the fountain to the wall using 1/4" (6 mm) lag screws or bolts (not included).
- Connect the fountain to the building supply line by running a water line between the shut‑off valve and the fountain inlet.
- Turn on the water supply and check all connections for leaks.
- Adjust the bubbler stream height using the regulator screw; recommended stream height is approximately 1" (25 mm).
- For detailed steps, refer to the Elkay EDF15R installation manual or contact a licensed plumber.
Maintenance
- Inspect the bubbler orifice periodically for mineral deposits; clean using a round file or small diameter wire.
- Adjust the stream regulator if supply pressure varies; clockwise raises stream height, counterclockwise lowers it.
- Recommended stream height is 1" (25 mm) at 45–50 psi supply pressure.
- Check all water connections regularly for leaks and reseal if necessary.
- Clean exterior surfaces with mild soap and water; avoid abrasive cleaners that may damage the finish.
- Disconnect water supply before servicing internal components to avoid hazards.
- For service or repairs, consult the manual or a certified Elkay service representative.