Elkay 98543C | Electrical Package Kit for ezH2O Bottle Fillers
Elkay 98543C | Electrical Package Kit for ezH2O Bottle Fillers is backordered and will ship as soon as it is back in stock.
Shipping
Shipping
🚚✨ Free Shipping in the Continental U.S.
All Products. No Minimums.
Estimated Shipping Times:
Important Note on Delivery Times
All shipping estimates provided are approximate only. While we always strive to meet or exceed your delivery expectations, we cannot guarantee the exact delivery times listed.
For time-sensitive orders, please contact us directly so we can provide a more accurate lead time estimate based on your specific requirements.
Same Day Shipping
All in stock orders received before 3PM EST will ship the same day. Orders received after 3PM EST will ship the following business day.
Water Filters, Hand Dryers, & Indoor Bottle Fillers are our most popular in stock items.
Outdoor Tubular Drinking Fountains
Evergreen normally ships in 5-15 days. Black, Gray and Blue ship in 2-4 weeks.
Ice Machines
In stock units ship within 48 hours. Other units normally ship in 2-4 weeks.
Other
Orders that ship directly from a manufacturer normally have a firm shipping estimate but those dates are subject to change due to manufacturer production, inventory or shipping. We do our best to estimate ship dates but orders shipping directly from the manufacturer can have unexpected delays. We will confirm tracking information when orders ship directly from a manufacturer but may not have updates or estimates beyond the original estimate. Once your order is placed with the manufacturer, it may not be able to be cancelled even if it hasn't shipped yet.
Please contact support@bottlefillingstations.com to confirm delivery time for a specific product or quantity. Or to inquire about an existing order.
Special Case Shipping Rates
Please note that shipping rates are subject to change at any time. We reserve the right to charge an additional fee in addition to the regularly advertised shipping fee for shipping to remote areas not easily accessible by typical freight carrier means (i.e. islands only accessible by ferry). If your order falls into this category, you will be notified upon receipt of your order, and have the option to complete the purchase with additional fee or to cancel the order. Please note, these instances are very rare, as most locations are reachable by regular freight. If you have any questions, please contact us!
Key Terms & Conditions
Exceptions may apply to islands and other remote territories.
All orders shipped by the carrier of our choice.
The Elkay 98543C Electrical Package Kit is a genuine OEM replacement kit designed to restore the electrical functions of Elkay ezH2O® bottle filling stations. It includes essential boards, wiring, and hardware needed to repair or replace the unit’s sensor, LED lighting, and control systems, ensuring reliable operation in commercial environments.
Key Specifications:
| Design | Electrical package kit for Elkay ezH2O® bottle fillers |
| Compatibility | Works with Elkay ezH2O® bottle filling stations and coolers requiring electrical board replacement |
| Components Included | Sensor board, LED board, control board, lens, washers, spacers, screws, wiring harness |
| Construction | Factory‑tested electronic components designed to restore sensor activation, LED lighting, and bottle counter functions |
| Standards Compliance | Genuine Elkay OEM part; PROP65 warning applies |
Features & Benefits:
- Restores Functionality: Replaces malfunctioning electrical components to ensure proper sensor activation and LED display.
- Direct Fit: Manufactured by Elkay as a genuine OEM part for seamless integration.
- Quick Installation: Includes all necessary hardware and wiring for straightforward replacement.
- Durability: Built to Elkay’s commercial standards for high‑traffic environments.
- Cost‑Effective: Extends the life of the bottle filler without requiring full unit replacement.
What's Included:
- Sensor board
- LED board
- Control board
- Lens
- Washers and spacers
- Screws
- Wiring harness and installation hardware
How to Install the 98543C Kit:
- Turn off power to the bottle filling station before beginning work.
- Remove the front panel of the unit to access the electrical components.
- Disconnect wiring harnesses from the existing sensor, LED, and control boards.
- Unscrew and remove old boards along with lens, washers, and spacers.
- Install new boards and components from the 98543C kit, securing them with provided screws and spacers.
- Reconnect wiring harnesses to the new boards, ensuring proper alignment and secure connections.
- Reattach the front panel and restore power to the unit.
- Test the system to confirm sensor activation, LED lighting, and bottle counter functions are working correctly.
FAQ
Q: Which Elkay Units Use the 98543C Kit?
A: It is designed for Elkay ezH2O® bottle fillers and coolers that require replacement of the electrical assembly such as LZS8WSSK, LZSTL8WSSK, and similar.
Q: Can I Install This Kit Myself?
A: Installation should be performed by a qualified service technician to ensure proper wiring and safety.
Q: What Functions Does This Kit Restore?
A: It restores sensor activation, LED lighting, and bottle counter functions of the unit.
Q: Is This Kit Lead‑Free?
A: Yes. It complies with Elkay’s manufacturing standards, though PROP65 warnings apply in California.
Q: How Long Does Installation Typically Take?
A: With proper tools and experience, installation can usually be completed in under an hour.
Q: Does the Kit Include All Necessary Hardware?
A: Yes. It comes with boards, wiring harness, screws, washers, spacers, and lens for a complete replacement.
NOTICE: Do not use with water that is unsafe or of unknown quality without adequate disinfection either before or after the system.
"Hydrate Everyone, Everywhere!" BottleFillingStations.com | Contact us now
The Elkay 98543C Electrical Package Kit is an OEM replacement assembly for EZH2O® bottle filling stations and coolers. It restores proper sensor activation, LED display, and control board functionality in non‑enhanced models.
Key Installation Requirements:
- Disconnect electrical power before servicing to avoid shock hazard
- Shut off water supply prior to installation
- Mount sensor board, LED board, and control board securely using supplied hardware
- Connect wiring harness to sensor, LED, and control boards
- Ensure lens and sensor are properly aligned for accurate activation
- Verify all connections are tight and free of debris
Important Notes Before Installing:
- Only install on compatible non‑enhanced EZH2O® models — not for “P” enhanced units
- Indoor installation only; do not use outdoors or in vandal‑resistant units
- Qualified service personnel should perform replacement to ensure safety
- Always depressurize the system before disconnecting wiring or components
- Provide adequate clearance for servicing and avoid pinching or straining wires
- Use genuine Elkay parts to maintain warranty and certification
Basic Installation Overview:
- Disconnect electrical power and shut off water supply
- Remove front panel to access electrical assembly
- Disconnect old boards, lens, and wiring harness
- Install new sensor board, LED board, and control board using supplied spacers and screws
- Attach lens and reconnect wiring harness
- Restore water supply and electrical power
- Test bottle filler to confirm proper sensor activation, LED display, and counter operation
For complete step‑by‑step instructions, refer to Elkay EZH2O® service manuals and OEM documentation for electrical kit replacement.
Want to Order the 98543C Electrical Package Kit or Get a Custom Quote?
Shop now at BottleFillingStations.com





