Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Zurn Z831C4-XL Installation Instructions & Guidance

The Zurn Z831C4-XL is designed for deck-mounted widespread installation on commercial lavatory sinks and counters, with handle centers adjustable from 6" to 20". Professional installation by a licensed plumber is recommended.

Key Installation Requirements:

  • Widespread sink or deck with handle centers between 6" and 20"
  • Mounting surface up to 1-1/8" thick
  • Hot and cold water supplies that connect to the 1/2" NPSM coupling nuts
  • Water pressure no higher than 125 PSI and water temperature no higher than 180°F
  • Lavatory drain (not included)

Important Notes Before Installing the Z831C4-XL:

  • A drain is not included. Zurn offers a pop-up drain (-P), grid strainer (-G) or offset grid drain (-GH) as optional add-ons.
  • Hand-tighten the valve body and mounting nuts. Do not overtighten.
  • The aerator may need cleaning at start-up. Unscrew it, clean it and hand-tighten it back in place.
  • Always refer to the official Zurn Z831C4-XL Spec Sheet for rough-in dimensions and flow options.

Basic Installation Overview:

  1. Shut off the water supply to the installation area.
  2. Set the valve bodies through the sink or deck at the desired centers, and secure them with the included mounting hardware, hand-tight.
  3. Install the 8" gooseneck spout into the base or diverter tee in the rigid or swing position, then tighten the nut.
  4. Connect the hot and cold supplies to the 1/2" NPSM coupling nuts.
  5. Install the wrist blade handles and tighten the handle nuts to 15-20 in-lbs.
  6. Turn on the water, flush the lines, clean the aerator if needed and check all connections for leaks.

For complete step-by-step instructions, download the official Zurn Z831C4-XL Installation Manual


Want to Order the Z831C4-XL or Get a Custom Quote?

Shop now at BottleFillingStations.com


Go to Table of Content