Zurn Z831B4-XL Installation Instructions & Guidance

The Zurn Z831B4-XL is designed for deck-mount widespread installation on commercial and institutional lavatories with 6" to 20" centers. Professional installation by a licensed plumber is recommended to ensure proper performance and code compliance.

Key Installation Requirements:

  • Three-hole widespread sink or countertop up to 1-1/8" thick, with hole spacing between 6" and 20" centers
  • Hot and cold water supplies with lavatory supply lines that connect to the faucet's 1/2" NPSM coupling nuts (supply lines not included)
  • Supply shut-off stops (not included)
  • Water pressure up to 125 PSI and water temperature up to 180°F
  • Lavatory drain assembly (not included)

Important Notes Before Installing the Z831B4-XL:

  • The pop-up drain (-P), grid strainer (-G) and offset grid drain (-GH) are optional and sold separately.
  • Hand-tighten the valve body nuts and do not overtighten; handle nuts are torqued to 15-20 in-lbs.
  • Flush supply lines before final use. It may be necessary to shut off water and remove the cartridges to clean the lines.
  • The aerator may need to be unscrewed and cleaned at start-up.
  • Replacement cartridges are the Zurn 59517007 (cold) and Zurn 59517008 (hot).
  • Always refer to the official Zurn Z831B4-XL Spec Sheet for rough-in dimensions, flow options and compliance details.

Basic Installation Overview:

  1. Fit the gasket onto the base shank, pass the base through the sink's center hole, and secure it with the washer, lockwasher and flanged mounting nut.
  2. Insert the valve body assemblies from underneath the sink, place the washers and retaining rings on the shanks above the deck, and hand-tighten the nuts.
  3. Place the tee gasket between the tee and base shank, secure the tee with the shank nut, and tighten the escutcheons onto the cartridge caps.
  4. Install the spout into the base and tighten its nut, then attach the handles to the cartridge stems and insert the color index buttons.
  5. Connect the lavatory supply lines to the faucet using the 1/2" NPSM coupling nuts.
  6. Hand-tighten the aerator onto the spout end, turn on the water supply, operate the faucet and check for leaks.

For complete step-by-step instructions, download the official Zurn Z831B4-XL Installation Manual