Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Zurn Z831B4-XL Installation guide

Installation

  • Place the gasket onto the shank of the faucet base and insert the base through the center hole of the sink.
  • Secure the base from underneath using the washer, lockwasher, and flanged mounting nut; hand‑tighten only to avoid damage.
  • Position the valve body assemblies under the sink, align with the shanks, and secure with washers and retaining rings.
  • Hand‑tighten the mounting nuts to hold the assemblies firmly in place; do not overtighten.
  • Install the tee assembly between the shanks with gasket and nut; tighten securely.
  • Thread escutcheons onto cartridge caps to secure the faucet body to the sink.
  • Insert the spout into the base and tighten the spout nut; connect swing or rigid spout as required.
  • Attach handles onto cartridge stems and insert index buttons.
  • Connect lavatory supply lines to the faucet using riser nuts; install optional pop‑up or grid strainer if specified.
  • Install the aerator onto the spout end; hand‑tighten and clean if necessary at startup.
  • Turn on water supply and operate the faucet, checking all connections for leaks.
  • For detailed steps, refer to the installation manual provided in the package or contact a licensed plumber/electrician.


Maintenance

  • Clean the polished chrome finish with mild soap and water; avoid acids or abrasive cleaners.
  • Inspect cartridges periodically; shut off water supply before removal.
  • Remove handles and escutcheons to access cartridges; replace if worn or damaged.
  • Check aerator regularly for sediment buildup; clean or replace as needed.
  • Verify handle nut torque remains within 15–20 in‑lbs for proper sealing.
  • Ensure water pressure does not exceed 125 psi and operating temperature remains below 180°F.
  • For service or repairs, consult the manual or a certified service representative.

Go to Table of Content