Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Zurn Z7440‑XL Installation Guide

Installation


  • Shut off hot and cold water supplies before beginning installation.
  • Place faucet base plate on lavatory sink; apply plumber’s putty or silicone sealant if required for watertight seal.
  • From underneath the sink, position mounting bracket on studs and secure with hex nuts; tighten firmly.
  • If faucet includes pop‑up or grid drain, install assembly per instructions (apply putty under flange, connect tailpiece, tighten gaskets and nut).
  • Connect left inlet tube to hot water supply and right inlet tube to cold water supply; avoid kinking tubes during connection.
  • Install aerator of choice (standard 2.2 GPM, vandal‑resistant 1.5 GPM, spray outlet 1.0 GPM, laminar flow, or flow control 0.5 GPM) using washer and key if required.
  • Turn water on, remove aerator, and flush valve for 1 minute to clear debris; check for leaks under sink.
  • Replace aerator and verify proper water flow.
  • For detailed steps, refer to the Zurn Z7440‑XL installation manual or contact a licensed plumber.


Maintenance


  • Replace cartridge assembly with limit stop (RK7440‑CART) if faucet leaks from handle; tighten retaining nut snugly.
  • Clean aerator periodically to remove debris; reinstall securely to prevent angled spray or leaks.
  • Adjust temperature limit stop by removing handle, repositioning stop on cartridge, and reinstalling handle.
  • Clean faucet finish with mild soap and water; avoid abrasive cleaners or polishes that may damage surface.
  • Always use genuine Zurn replacement parts to maintain warranty and performance.
  • For service or repairs, consult the manual or a certified representative.


Go to Table of Content