Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Zurn RK7000-50 Installation Instructions & Guidance

The Zurn RK7000-50 replaces the complete control stem in a Temp-Gard® I shower valve and installs from the front of the valve by removing the bonnet. Professional installation by a licensed plumber or trained maintenance technician is recommended to ensure the stem is seated correctly and the valve maintains proper pressure-balancing performance.

 

Key Installation Requirements:

  • Existing Zurn Temp-Gard® I valve (Z7100, Z7120, Z7200, or Z7220 Series)
  • Water shut off at the valve's integral service stops
  • Access to the valve after removing the handle and cover plate
  • Maximum valve operating pressure of 125 PSI

 

Important Notes Before Installing the RK7000-50:

  • Open the valve to the full hot position before removing the bonnet to avoid distorting the control stem.
  • Do not tamper with the control spindle or attempt to remove the piston.
  • While the valve is open, inspect the seats and seat O-ring. Worn seats require the RK7000-180 seat replacement kit and RK7000-18TOOLS (or RK7000-18TOOL) seat tools.

 

Basic Installation Overview:

  1. Shut off the water to the valve using the service stops.
  2. Back out the adjustment screw until the O-ring is fully exposed.
  3. Turn the valve to full hot and unscrew the bonnet. The old control stem comes out with the bonnet. Leave the packing nut in place.
  4. Loosen the packing nut before inserting the new control stem to protect the packing components.
  5. Lubricate the new stem's shaft threads with the included lubricant packet, then insert it into the bonnet.
  6. Reassemble the valve, open the service stops, and test for consistent temperature and leaks.


Want to Order the RK7000-50 or Get a Custom Quote?

Shop now at BottleFillingStations.com

Go to Table of Content