Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Oasis PGF8ACSL Installation Guide

The Oasis PGF8ACSL is a wall-mounted refrigerated bi-level drinking fountain with 8.0 GPH chilling and a choice of VersaFilter III, Total PFAS, or Pharmaceutical filtration.


Before You Begin

  • Tools: Pilot drill bit, power drill, slotted screwdriver, T15 Torx driver, bubble level, tape measure, and a tool for cutting plastic pipe. Wall anchors (8 per unit), a 1-1/4" P-trap, and a water shut-off valve are not included.
  • Plumbing: Provide a 3/8" water supply with shut-off valve and a 1-1/4" IPS drain stub-out. Maximum supply pressure is 100 PSI, so install a pressure regulator if spikes could exceed that. Flush the supply line before installing.
  • Electrical and ventilation: Provide a 115V outlet with 20A minimum GFCI protection. Allow 4" of clearance per side for ventilation.
  • Safety and support: Some states require a licensed plumber, and all connections must meet local plumbing codes. Do not alter or modify the unit, as this voids the warranty and UL listing.
  • Installation reference: See the installation manual for rough-in diagrams, left or right side high orientation, and detailed instructions.


Step-by-Step Installation Guide

  1. Plan and mount the brackets: Check the rough-in locations against the manual's diagram. The unit ships right side high, and the cooler must always be on the right for airflow. Install the level hanger brackets with 2 anchors each.
  2. Hang and secure the unit: Hang it on the galvanized steel frame, not under the return edge of the stainless basin top. Remove the front panels, mark the anchor holes, drill pilot holes, and secure the unit with wall anchors.
  3. Install the drain: Fit the included drain components with the sponge tubing on the brass drain pipe. Connect a P-trap to the drain stub-out and basin drains, cutting the drain pipe as needed.
  4. Connect the water lines: Connect the copper inlet tube to the shut-off valve and route all lines through the interior side panels. Replace the plug on the cold tank with the included 1/4" union fitting, and connect the insulated fountain line to it.
  5. Test and power on: Turn on the water, check for leaks, and run both bubblers until the streams are constant. Rotate the condenser fan blade by hand to confirm it is free, then plug in the unit.
  6. Adjust and finish: Turn the slotted adjustment knob beneath the fountain nose until the stream is at least 4" high per ADA requirements. Reinstall the front panels once testing is complete.


Looking for the Oasis PGF8ACSL Refrigerated Bi-Level Drinking Fountain?

Oasis PGF8ACSL Refrigerated Bi-Level Drinking Fountain w/ Filter Options
Refrigerated Bi-Level Fountain, Filtered Oasis PGF8ACSL Wall-mounted refrigerated bi-level drinking fountain with 8.0 GPH of 50°F chilled water and filtration options.
Shop Now
Go to Table of Content