The Murdock GYM74-LPC, GYQ84-LPC, M-OBF4-LPC, and M-OBFM4-LPC Series are chiller-ready outdoor stainless steel pedestal hydration stations that offer a bottle filler and, on select models, a drinking fountain for convenient water access in parks, schools, and other public spaces.
Before You Begin
- Tools needed: Standard plumbing and mounting tools, along with the anchoring hardware specified in the owner's manual for your model and mounting surface.
- Safety first: Installation must comply with all applicable local plumbing and building codes. Shut off the water supply before making any connections, and use a potable water source only. For outdoor installations, protect the unit and supply lines from freezing to prevent cracking and leaks.
- Site requirements: Confirm that the mounting surface, water supply, and drainage connections meet the specifications in the owner's manual before you begin.
Step-by-Step Installation Guide
- Review the owner's manual and verify that all required components are present before beginning installation.
- Prepare the installation site, ensuring the mounting surface, water supply, and drainage connections meet the requirements specified in the manual.
- Position and securely anchor the unit according to the model-specific mounting instructions.
- Connect the potable water supply and drainage components according to the manual and applicable plumbing codes.
- If optional accessories or a water chiller are included, install and connect them according to their respective manufacturer instructions.
- Turn on the water supply and inspect all connections for leaks. Check that the drainage system functions properly.
- Flush and test the fixture according to the manufacturer's instructions to verify proper operation before placing it into service.


