Installation
- Mount hanger brackets securely to the wall, ensuring they are level and anchored to support the cooler’s weight.
- Hang the water coolers on the brackets, making sure units are square and level for proper bubbler stream.
- Anchor the lower mounting points to the wall and shim if necessary.
- Flush the 3/8" O.D. supply line thoroughly, then connect to the angle stop valve using the provided copper tube.
- Connect the waste tailpieces with the supplied flexible hose and clamps, then install a 1‑1/4" O.D. P‑trap (by others).
- Provide 4" minimum clearance on each side for ventilation; ensure refrigerated unit remains in the right‑hand position.
- Plug into a GFCI‑protected electrical outlet (115V standard, 220V optional) and ground per electrical codes.
- For detailed steps, refer to the installation manual provided in the package or contact a licensed plumber/electrician.
Maintenance
- Inspect water and drain connections regularly for leaks.
- Adjust bubbler stream direction and flow regulator as needed to minimize splashing.
- Clean stainless steel and powder‑coated surfaces with mild soap and water; avoid abrasive cleaners.
- Optional WF3EZ or WF3000 filters should be replaced every 3,000 gallons or annually; flush 6 gallons before use.
- Outdoor VR models should be installed under cover, caulked at wall contact points, and protected from extreme temperatures.
- Check condenser fan and ventilation grills to ensure proper airflow; clean condenser if needed.
- For service or repairs, consult the manual or a Murdock Certified Service Representative.