Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Hoshizaki Ice Bagger

Installation
  • All plumbing and electrical connections must comply with state and local codes and regulations.
  • Place the unit on a level surface with adequate clearance for operation and maintenance.
  • Connect to a dedicated 115V/60Hz/1 phase power supply and test safety interlocks.
Maintenance
  • Clean stainless steel exterior and ice storage area regularly to maintain hygiene.
  • Inspect agitators and auger for wear and ensure proper operation.
  • Check safety overload and interlock switches periodically for proper function.
Go to Table of Content