Installation
- All plumbing and electrical connections must comply with state and local codes and regulations.
- Place the unit on a level surface with adequate clearance for operation and maintenance.
- Connect to a dedicated 115V/60Hz/1 phase power supply and test safety interlocks.
Maintenance
- Clean stainless steel exterior and ice storage area regularly to maintain hygiene.
- Inspect agitators and auger for wear and ensure proper operation.
- Check safety overload and interlock switches periodically for proper function.