Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Hoshizaki f-300/500baj installation guide

Installation

  • Place the icemaker indoors on a firm, level surface with proper clearance (6" at sides/rear, 24" at top).
  • Attach the adjustable legs and level the unit front‑to‑back and side‑to‑side.
  • Connect the cold water supply line (1/2" FPT inlet, minimum 10 psi, maximum 113 psi). Install a shut‑off valve.
  • Connect the drain lines (3/4" FPT outlets for icemaker and bin) with a proper air gap to a floor drain.
  • Plug into a grounded 115V, 60Hz outlet (NEMA 5‑15 for corded models) or hard‑wire per local code.
  • Open the water supply valve, check for leaks, and then switch the control to “ICE.”
  • For detailed steps, refer to the installation manual provided in the package or contact a licensed plumber/electrician.


Maintenance

  • Clean the ice scoop daily with mild detergent and rinse thoroughly.
  • Inspect and wash air filters every two weeks.
  • Wipe down the exterior monthly with a soft cloth and neutral cleaner.
  • Once a year, clean and sanitize the icemaker and bin liner using Hoshizaki “Scale Away” cleaner and sanitizer.
  • Check condenser, water inlet screens, and hoses yearly; clean or replace if needed.
  • Always unplug the unit and shut off water before servicing.
  • For service or repairs, consult the manual or a Hoshizaki Certified Service Representative.

Go to Table of Content