The Haws 1119P is a vandal‑resistant hydration station that combines a touchless bottle filler with hi‑lo drinking fountains. Designed for schools, transportation facilities, parks, and other high‑traffic public environments, it provides durable hydration access while helping encourage reusable bottle use.
Key Installation Requirements:
- Wall‑mounted installation with adequate structural support
- Cold water supply connection required
- Drain connection required for fountain operation
- Electrical supply required for bottle filler sensor activation
- Provide access for future maintenance and servicing
- Follow ADA guidelines and local plumbing codes during installation
Important Notes Before Installing:
- Always shut off water and power before installation or servicing
- Ensure the wall structure can support the unit's operating weight
- Do not overtighten plumbing connections or mounting hardware
- Verify proper drainage before placing the unit into service
- Keep the bottle filler sensor area unobstructed for reliable activation
- Inspect all water connections for leaks during startup
Basic Installation Overview:
- Prepare the wall and verify rough‑in requirements
- Install mounting brackets and support hardware according to specifications
- Connect the water supply line to the fountain assembly
- Connect the waste line to the building drainage system
- Complete electrical connections for bottle filler operation
- Pressurize the water system and inspect all connections for leaks
- Test bottle filler activation and drinking fountain operation
- Complete final inspection and verify proper performance
For complete specifications and installation guidelines, download the official 1119P Spec Sheet and the Installation Manual.