Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Halsey Taylor HAC cooler guide

Installation

  • Remove hanger bracket from the back of the cooler and mount securely to the wall.
  • Ensure bracket is properly supported; add a support carrier if the wall is not strong enough.
  • Hang the cooler on the bracket, making sure it engages correctly in the slots.
  • Remove the front panel to access connections; connect the water inlet line.
  • Install the trap and gasket on the waste line, then tighten securely.
  • Reinstall the front panel after plumbing connections are complete.
  • Turn on water supply, check for leaks, and verify bubbler stream height (factory set at 45–50 psi).
  • For detailed steps, refer to the installation manual provided in the package or contact a licensed plumber.


Maintenance

  • Inspect bubbler and regulator periodically; adjust stream height if needed.
  • Check fittings and tubing for leaks; reseat connections if necessary.
  • Clean basin and exterior surfaces with mild, non‑abrasive cleaner.
  • If taste, odor, or sediment issues occur, consider adding a compatible filter module.
  • For service or repairs, consult the manual or a licensed technician.

Go to Table of Content