The Elkay MF200 bi-level mounting frame is designed for in-wall installation of two-station refrigerated drinking fountains in new construction and renovation projects. Professional installation by a licensed contractor or plumber is strongly recommended to ensure proper wall framing, rough-in placement, and a secure, square installation.
Key Installation Requirements:
- Wall opening of 37-1/2" W x 37-3/4" H, set 4-1/2" above the floor line
- Minimum 12" depth from the finished wall face to the back of the wall
- Wall opening reinforced on all sides to support up to 150 lbs static load
- (12) 5/16" bolts or screws to secure the frame to the wall (not included)
- At least 4" of air flow clearance on both sides and the top of the remote chiller
- Plumbing rough-in and a 120V, 60 Hz, single-phase, 3-wire 10 amp branch circuit for the chiller
Important Notes Before Installing the MF200:
- Wall fasteners are not included. The installer must supply twelve 5/16" bolts or screws for the frame and appropriately sized fasteners for the chiller shelf.
- Decide on the standard (higher unit on the left) or reversed (higher unit on the right) configuration before framing the opening.
- The wall opening dimensions are required for proper rim and bubbler heights under ANSI A117.1. Refer to the fountain model for final ADA compliance.
- If the frame is placed next to a bottle filler unit, leave a double stud or 3" of space between mounting frames.
- Make sure the frame is square, and do not use fewer or smaller fasteners than required.
- Always refer to the official Elkay MF200 Spec Sheet for dimensions and compatibility, and to the fountain's own installation manual for unit-specific steps. Elkay notes the actual frame may vary from the one illustrated.
Basic Installation Overview:
- Cut a square, rectangular wall opening 37-1/2" W x 37-3/4" H, 4-1/2" above the floor line.
- Reinforce the opening on all sides so it supports up to 150 lbs static load and gives a way to secure the frame.
- Install the plumbing and electrical rough-ins.
- Remove the frame and hardware from the packaging, then bolt the two frames together through the upright supports with the (4) 5/16" x 3/4" bolts and nuts provided.
- Set the frame assembly squarely in the opening with the upright edges flush with the finished wall face, then secure it with (12) 5/16" bolts or screws.
- Attach the chiller shelf support rods to the right-side frame uprights at the second set of holes from the bottom and to the shelf's side holes, then fasten the shelf to the frame bottom and wall.
- Continue with the fountain and chiller installation according to the unit's installation manual.
For complete step-by-step instructions, download the official Elkay MF200 Mounting Frame Installation Instructions