Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Elkay MB24 Installation

Installation
  • Use 4 screws or bolts through the provided holes on each side of the wall box (hardware by others).
  • Ensure mounting height aligns with cooler rough-in specifications: recommended 40" (1016mm) floor to rim.
  • Verify dimensions: 16 1/2" (419mm) width, 29 1/2" (749mm) height, 6 3/4" (171mm) depth, 10 3/4" (273mm) clearance.
  • Tighten all fasteners securely to maintain stability and support.
  • If installation is difficult, contact a licensed professional or authorized Elkay service technician.
Maintenance
  • Inspect mounting screws or bolts periodically to ensure they remain tight and secure.
  • Check wall box alignment during routine facility maintenance to prevent stress on cooler connections.
  • Clean exposed surfaces with non-abrasive cleaner to maintain finish.
  • Replace any worn or corroded fasteners with equivalent hardware to preserve structural integrity.
Go to Table of Content