Installation
- Use 4 screws or bolts through the provided holes on each side of the wall box (hardware by others).
- Ensure mounting height aligns with cooler rough-in specifications: recommended 40" (1016mm) floor to rim.
- Verify dimensions: 16 1/2" (419mm) width, 29 1/2" (749mm) height, 6 3/4" (171mm) depth, 10 3/4" (273mm) clearance.
- Tighten all fasteners securely to maintain stability and support.
- If installation is difficult, contact a licensed professional or authorized Elkay service technician.
Maintenance
- Inspect mounting screws or bolts periodically to ensure they remain tight and secure.
- Check wall box alignment during routine facility maintenance to prevent stress on cooler connections.
- Clean exposed surfaces with non-abrasive cleaner to maintain finish.
- Replace any worn or corroded fasteners with equivalent hardware to preserve structural integrity.