Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Elkay LVRCTL8WSK Installation Guide

The Elkay LVRCTL8WSK is a bi‑level, vandal‑resistant bottle filling station with integrated filtration and refrigeration. Designed for schools, parks, transportation facilities, and other high‑traffic public environments, it combines touchless bottle filling, chilled water delivery, and vandal‑resistant construction for dependable long‑term performance.


Key Installation Requirements:


  • Wall‑mounted installation with in‑wall carrier support
  • Cold water line only (40–100°F operating temperature)
  • Electrical supply: 115V / 60Hz grounded outlet with GFCI protection
  • Drain connections required for both fountain basins and bottle filler
  • Maintain clearance for filter replacement and refrigeration service
  • Follow ADA guidelines for installation height and accessibility

Important Notes Before Installing:


  • Do not connect to hot water lines
  • Always depressurize the water line before servicing or replacing the filter
  • Use only genuine Elkay replacement filters to maintain certified filtration performance
  • Ensure the bottle filler sensor area remains unobstructed for reliable activation
  • Provide adequate ventilation clearance around refrigeration components
  • Secure the unit firmly to the wall structure to maintain vandal‑resistant performance

Basic Installation Overview:


  1. Install the in‑wall carrier securely according to manufacturer specifications
  2. Connect the cold water supply line and flush plumbing thoroughly
  3. Install the filter head and filter cartridge assembly
  4. Connect drain lines from both fountain basins to the building drainage system
  5. Mount the cooler and bottle filler assembly to the carrier
  6. Connect electrical power to a grounded outlet
  7. Pressurize the system and inspect all plumbing connections for leaks
  8. Test bottle filler sensor activation, cooling performance, and water flow
  9. Install access panels and complete final adjustments

For complete specifications and installation guidelines, download the official LVRCTL8WSK Spec Sheet and the Installation Manual.


Want to Order the LVRCTL8WSK Bottle Filling Station or Get a Custom Quote?


Shop LVRCTL8WSK Bottle Filling Station


Go to Table of Content