Installation
- Secure hanger brackets to the wall using all six 1/4" mounting holes; add a support carrier if wall strength is insufficient.
- Hang the cooler on the bracket, ensuring slots on the back engage properly.
- Remove the lower front panel by loosening four screws, then set aside.
- Connect the 3/8" O.D. copper water supply line with shut‑off valve; maximum supply pressure 105 psi.
- Install the 1‑1/4" O.D. drain trap; ensure slip nut and gasket are tightened securely. Check for leaks if drain tube is cut and reassembled.
- Maintain at least 6" clearance from cabinet louvers to wall for ventilation.
- Plug into a GFCI‑protected electrical outlet; unit requires power for water flow.
- For detailed steps, refer to the installation manual provided in the package or contact a licensed plumber/electrician.
Maintenance
- Clean exterior panels regularly with warm soapy water or mild household cleaner.
- Use extra caution on mirror‑finished stainless steel; clean only with mild soap and water or glass cleaner and a soft cloth.
- Avoid harsh chemicals, petroleum‑based, or abrasive cleaners; use of these will void warranty.
- Inspect bubbler, pushbars, solenoid valve, and regulator during service; replace worn parts with authentic kits.
- Disconnect power before servicing; electrical shock hazard.
- For service or repairs, consult the manual or a certified service representative.