Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Elkay Enhanced bi-level guide

Installation

  • Secure hanger brackets to the wall using all six 1/4" mounting holes; add a support carrier if wall strength is insufficient.
  • Mount the refrigerated cooler on the right side of the bracket, ensuring proper engagement in the slots. Mount the non‑refrigerated cooler on the opposite side.
  • Connect the 3/8" O.D. copper water supply line with shut‑off valve; maximum supply pressure 105 psi.
  • Connect the 1‑1/2" O.D. waste outlet to a trap (not furnished), maintaining proper air gap. Check for leaks if drain tube is cut and reassembled.
  • Maintain at least 6" clearance from cabinet louvers to wall for ventilation; allow 24" clearance above for service access.
  • Install the bottle filler mounting plate securely above the basin, route tubing and wiring harness through the gasket, and connect to cooler bulkhead fittings.
  • Plug into a GFCI‑protected electrical outlet; a dedicated 20‑amp circuit is recommended.
  • For detailed steps, refer to the installation manual provided in the package or contact a licensed plumber/electrician.


Maintenance

  • Replace filters as required; turn off water supply, relieve pressure, unplug unit, and install new cartridge fully clockwise.
  • Clean exterior panels with warm soapy water or mild household cleaner; avoid harsh chemicals or abrasives.
  • Inspect bubbler, pushbars, solenoid valves, and regulators during service; replace worn components with authentic kits.
  • Check drain assembly periodically to ensure proper flow and no leaks.
  • Disconnect power before servicing; electrical shock hazard.
  • For service or repairs, consult the manual or a certified service representative.

Go to Table of Content