Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Elkay EMAB/LMAB series guide

Installation

  • Prepare wall framing and hanger bracket per rough‑in dimensions provided in the package manual.
  • Mount hanger bracket securely using all designated holes; add support carrier if wall will not provide adequate support.
  • Hang cooler on bracket, ensuring proper engagement with slots on the back panel.
  • Remove front panel to access connections; connect water inlet line and install trap on waste outlet.
  • If available, connect filter assembly and ensure proper orientation.
  • If available, connect refrigeration components and verify ventilation clearance.
  • Reconnect panel after plumbing is complete and check for leaks.
  • Adjust bubbler stream height as needed; factory set at 35 psi.
  • For detailed steps, refer to the installation manual provided in the package or contact a licensed plumber.


Maintenance

  • Inspect bubbler orifice and regulator periodically; clean or adjust if flow is irregular.
  • Check quick‑connect fittings and tubing for leaks; reseat if necessary.
  • Clean basin and exterior surfaces with mild, non‑abrasive cleaner.
  • If available, replace filter at recommended intervals.
  • If available, service refrigeration components as required.
  • For service or repairs, consult the manual or a licensed technician.

Go to Table of Content