Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Elkay EDFPVR217C Installation Guide

The Elkay EDFPVR217C Soft Sides® Bi‑Level Drinking Fountain is a vandal‑resistant, non‑filtered, non‑refrigerated unit designed for durability in high‑traffic public environments. Featuring Flexi‑Guard® Safety Bubblers and ADA compliance, it provides safe, accessible hydration at two stations.


Key Installation Requirements:


  • Wall‑mounted installation with proper in‑wall carrier support
  • Cold water line only (40–100°F operating temperature)
  • Supply line pressure: 20–105 PSI (regulator required if above 105 PSI)
  • Drain connection required for both fountain basins
  • Follow ADA guidelines for installation height and accessibility

Important Notes Before Installing:


  • Do not connect to hot water lines
  • Unit is non‑filtered; optional retrofit filtration kits are available separately
  • Always depressurize water line before servicing
  • Outdoor installation requires winterization or protection in extreme climates
  • Ensure proper drainage to avoid water damage from spillage
  • Secure fountain firmly to wall structure to resist vandalism

Basic Installation Overview:


  1. Mount in‑wall carrier securely to support dual fountain weight
  2. Position fountain assembly and secure to wall structure
  3. Connect cold water supply line to inlet
  4. Connect drain lines from both basins to building drain system
  5. Pressurize system slowly and check for leaks
  6. Test bubbler stream height; adjust regulator if needed
  7. Install bottom cover plates and finish trim

For complete specifications and installation guidelines, download the official EDFPVR217C Spec Sheet and the Installation & Maintenance Manual.


Want to Order the EDFPVR217C Bi‑Level Vandal‑Resistant Fountain or Get a Custom Quote?


Shop EDFPVR217C Drinking Fountain


Go to Table of Content