Buying more than 2? Email us for a discount: support@bottlefillingstations.com

FREE SHIPPING

All Products. No Minimums. 

Elkay 51299C Installation guide

Installation


  • Turn off water supply and disconnect electrical power to the cooler or bottle filling station before installing the Elkay 51299C filter.
  • Relieve pressure by dispensing water until flow stops.
  • Remove the used filter by turning it 1/4 turn counter‑clockwise; pull down to detach from the filter head.
  • Seal the used filter with the protective cap provided.
  • Remove protective cap from the new 51299C filter cartridge; firmly insert into filter head and rotate 1/4 turn clockwise until locked in place.
  • Ensure the front label is visible and facing forward once installed.
  • Turn on water supply and flush for 10 minutes to purge air and fine carbon particles.
  • Reconnect electrical power; verify green LED filter status indicator (if equipped) and reset filter monitor if necessary.
  • For detailed steps, refer to the Elkay 51299C installation manual or contact a licensed plumber/electrician.


Maintenance


  • Replace the Elkay 51299C filter every 1,500 gallons or 12 months, whichever comes first.
  • Inspect water connections regularly for leaks; reseal or tighten fittings as needed.
  • Check filter status indicator lights: green = good, yellow = nearing capacity, red = replace filter.
  • Reset filter monitor after replacement using the program button on compatible units.
  • Do not use with microbiologically unsafe water or water of unknown quality without adequate disinfection before or after the system.
  • Disconnect power and water supply before servicing internal components to avoid hazards.
  • For service or repairs, consult the manual or a certified service representative.


Go to Table of Content