Buying more than 2? Email us for a discount @support@bottlefillingstations.com

FREE SHIPPING

for all orders in the Continental U.S. Limited time only!!

Elkay Bottle Filling Station

INSTALLATION.

  • During a plumbing circuit inspection, be aware that the line might be grounded at a location away from the installation site, which could be outside the building or the area where the unit is being installed.
  • It is essential to consult local plumbing codes before beginning installation.


MAINTENANCE

  • Clean the entire unit, including the basin and bottle filler.
  • Clean the condenser and louvers if the unit is refrigerated.
  • Replace the filter if the unit is equipped with one.
  • If the bubbler orifice is scaly, clean it carefully to ensure proper water flow.
  • Inspect the height of the bubbler stream and adjust if needed. This task should be performed after changing the filter and cleaning the orifice.
  • Ensure the refrigeration system is cycling correctly by verifying that both the compressor and the fan activate and deactivate as intended.
  • Testing the activation of the bottle filler is essential to ensure it responds promptly and accurately when a bottle is placed for filling.
  • Testing the 20-second timeout feature of the bottle filler is essential.
  • Ensure that the water flow from the bottle filler is laminar, and clean, repair, or replace the nozzle as needed.